St Phillips Hall Floor Resurfacing

As part of a 10 year refurbishment plan, Morton Bros Contracting were tasked with the job to remove the existing hall floor at St Phillips College and replace the underlying structure with additional supports, in order to add more strength to the existing floor structure.