St Phillips Hall Floor Resurfacing

As part of a 10 year refurbishment plan, Morton Bros Contracting were tasked with the job to remove the existing hall floor at St Phillips College and replace the underlying structure with additional supports, in order to add more strength to the existing floor structure.

Once additional supports were installed, Morton Bros Contracting then applied a new layer of floor surface according the the required specifications provided by the client. The project was undertaken during the Christmas school holidays to ensure there were no interruptions to the classroom timetables and schedules.

PROJECT TITLE: Hall Floor Resurfacing
CATEGORY: Commercial
LOCATION: St Phillips College Alice Springs
CLIENT: St Phillips College
VALUE: $150,000.00
STATUS: Completed January 2021